image description

2011 Construction Management Services

City of Big Bear Lake Department of Water and Power

WSC served as Construction Managers for the City of Big Bear Lake Department of Water and Power’s (BBLDWP) 2011 Water System Improvement Program (WSIP).  The 2011 WSIP included the installation of 29,000 linear feet of 8-inch water main and the equipping of three water wells, one with treatment plant.  The 2011 WSIP was part two of a two part program, which in total delivered 36,000 linear feet of 8-inch and 10-inch water main, the drilling of two water wells, and the equipping  five water wells for the community of Big Bear.  To fund this program, WSC helped the BBLDWP secure $11 million dollars from the USDA’s Rural Development Program.

WSC prepared the preliminary engineering report, which defined the scope of the program, prepared the design RFP’s, reviewed the proposals and recommended a design consultant for the 2011 WSIP.  WSC provided design review services and assisted the BBLDWP to obtain City of Big Bear Lake and County of San Bernardino encroachment permits.  WSC helped the BBLDWP bid the projects, reviewed the contractor’s bids, and recommended the award to the BBLDWP.

During construction, WSC managed five construction contracts simultaneously; three pipeline contracts and two well equipping contracts.  WSC performed submittal review, responded to RFI’s, managed the project schedule, facilitated weekly progress meetings, managed change orders, prepared grant and loan draw requests,  reviewed pay requests , and provided daily inspection services.

SIMILAR PROJECTS

Engineering Consultant Services

City of Arroyo Grande

The City of Arroyo Grande hired WSC to become part of the City’s Engineering Team by providing ongoing, as-needed engineering services.  WSC and individual…

Read More

Carmel River Re-Route and San Clemente Dam Removal

California American Water

WSC is the project manager and construction manager for the removal of the San Clemente Dam and restoration of the Carmel River. When completed,…

Read More

Lift Station 2 and 3 Construction Management

City of Morro Bay

WSC was hired by the City of Morro Bay to perform on-call construction management services for the City. As Owner’s Representative, WSC delivered infrastructure…

Read More